David's Astronomy Pages
Notes - Session 1314 (2025-04-10)

 
Bullet Session Aims & Highlights
 - Observing Result
 - Night Summary Plot
 - Session Event Log
Bullet Operational Issues
  - Critical Issues (0),  Major Issues (0),  Minor Issues (1),  Small Defects (2),  Continuous Improvement (1)
Bullet Images from 2025-04-10 >>         
Bullet Geomagnetic Station - Final Assembly (2025-04-10 to 2025-04-11)
   

Session Aims & Highlights (2025-04-10)

Main aims

  1. Targets.  Acquire images of a selection of variable stars, nearby stars, comets & deep sky targets as allowed by sky conditions.
  2. C/2025 F2 (SWAN). Acquire images of new comet C/2025 F2 (SWAN)

 Equipment & Software

Highlights

Notes

Summary Plots & Logs

Observing Plan
Image
  
Observing Result
Image
   
Image
 
Dome & Scope Slewing Performance
Image
  
Slew/Centering Performance
Image
  
Guiding Performance
Image
  
Sky Conditions (Locate Frames)
Image 
  
Night Sky Summary Plot
Top axis: Sky Brightness at Zenith (in ADU/s)
Lefthand axis: Local Time (hh LT). Righthand axis: Sun Altitude (degs)
Image   
  
Actual Weather vs Pre-Session Weather Forecast
Image
Image
  
Session Event Log
Time     Event Detail
21:53:30 Session Monitoring AutoStart monitoring for Live Session opportunity between 21:53 & 03:55
21:53:33   AutoStart Delayed Session delayed due to too few stars
21:54:33 Session AutoStarting Session autostarting (21:54)
21:54:46   CCDSoft Restarting CCDSoft being restarted (to set AutoSave No.)
21:55:14   Camera1 Connected SBIG Camera connected (Set point -20°C)
21:55:16 Session Created Session Created (Live, 2025-04-10 S01314, ImageSaveNum: 1314001)
21:55:22   Scope Switched On Telescope Power has been switched on via UPB Powerbox.
21:57:08   Services Started Observatory Services started
21:57:16 Observatory (Auto) Observatory placed in Fully-Automated Mode
21:57:18   AutoStart Delayed Session delayed due to too few stars
21:57:21 Session Pending Session pending (2025-04-10)
21:57:23 Session Initiating Session initiating (2025-04-10)
21:57:30   Camera1 Connected SBIG Camera connected (Set point -15°C)
21:57:37   Plan Requested Observing Plan requested from AstroPlan (1.43)
21:58:04   Plan Loaded Observing Plan loaded to queue (Plan ID: 1098)
21:58:44   Telescope Connected Telescope connected (TheSky6)
21:59:08 Session Equilibration Session ready to Open Dome
22:00:13   Dome Opened Dome opened (Opening time 45s, Zigbee 41s)
22:00:38 Session Running Session running
22:00:41   Queue Started Observing Queue started (22 targets selected)
22:00:44     Target Started (NrZen) Target started (Focus Field 10, HIP 49253)
22:00:59       Dome Unparked Dome unparked
22:05:12       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
22:07:52       Focusing Completed Foc1 AutoFocus Completed (Profile No 1, wide)
22:10:13       Focusing Completed Foc1 AutoFocus Completed (Profile No 1)
22:10:17       Focusing Started-Foc2 Foc2 Focusing Started (Secondary Scope, using ShCap)
22:12:27       Focusing Completed Foc2 AutoFocus Completed (Profile No 2, wide)
22:14:19       Focusing Completed Foc2 AutoFocus Completed (Profile No 2)
22:14:39     Target Completed (NrZen) Target completed (Focus Field 10, HIP 49253)
22:14:43     Target Started (1/22) Target started (1/22, ESO 565-G19 w/SN2025efc)
22:19:45       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
22:22:33       Focusing Completed Foc1 AutoFocus Completed (Profile No 3)
22:39:53     Target Completed Target completed (1/22, ESO 565-G19 w/SN2025efc)
22:39:57     Target Started (2/22) Target started (2/22, 29P/Schwassmann-Wachmann)
22:59:50     Target Completed Target completed (2/22, 29P/Schwassmann-Wachmann)
22:59:54     Target Started (3/22) Target started (3/22, GCVS RZ LMi)
23:03:59       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
23:06:22       Focusing Completed Foc1 AutoFocus Completed (Profile No 4)
23:11:40     Target Completed Target completed (3/22, GCVS RZ LMi)
23:11:45     Target Started (4/22) Target started (4/22, AT2025yl (CV))
23:15:07       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
23:18:42       Focusing Completed Foc1 AutoFocus Completed (Profile No 5)
23:24:59     Target Completed Target completed (4/22, AT2025yl (CV))
23:25:03     Target Started (5/22) Target started (5/22, AT2025ghv)
23:45:27     Target Completed Target completed (5/22, AT2025ghv)
23:45:31     Target Started (6/22) Target started (6/22, NGC 2565 w/AT2025ccz)
23:49:17       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
23:51:44       Focusing Completed Foc1 AutoFocus Completed (Profile No 6)
00:08:12     Target Completed Target completed (6/22, NGC 2565 w/AT2025ccz)
00:08:17     Target Started (7/22) Target started (7/22, GCVS RR Leo)
00:12:52       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
00:15:03       Focusing Completed Foc1 AutoFocus Completed (Profile No 7)
00:21:13     Target Completed Target completed (7/22, GCVS RR Leo)
00:21:17     Target Started (8/22) Target started (8/22, GCVS CN Leo)
00:25:21       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
00:27:39       Focusing Completed Foc1 AutoFocus Completed (Profile No 8)
00:36:33     Target Completed Target completed (8/22, GCVS CN Leo)
00:36:37     Target Started (9/22) Target started (9/22, NGC 5957 w/SN2025fvw)
00:56:10     Target Completed Target completed (9/22, NGC 5957 w/SN2025fvw)
00:56:14     Target Started (10/22) Target started (10/22, AT2023df (CV))
01:00:09       Focusing Skipped Foc1 focusing skipped - star is too dim (TCF-S)
01:06:48     Target Completed Target completed (10/22, AT2023df (CV))
01:06:52     Target Started (11/22) Target started (11/22, UGC 10058 w/SN2025gvs)
01:10:34       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
01:13:24       Focusing Completed Foc1 AutoFocus Completed (Profile No 9)
01:29:41     Target Completed Target completed (11/22, UGC 10058 w/SN2025gvs)
01:29:45     Target Started (12/22) Target started (12/22, T CrB)
01:35:29       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
01:38:04       Focusing Completed Foc1 AutoFocus Completed (Profile No 10)
01:43:50     Target Completed Target completed (12/22, T CrB)
01:43:54     Target Started (13/22) Target started (13/22, 2023iwy)
02:04:34     Target Completed Target partially completed (13/22, 2023iwy)
02:04:38     Target Started (14/22) Target started (14/22, C/2023 A3 (Tsuchinshan-ATLAS))
02:08:44       Focusing Skipped Foc1 focusing skipped - star is too dim (TCF-S)
02:15:55     Target Completed Target completed (14/22, C/2023 A3 (Tsuchinshan-ATLAS))
02:15:59     Target Started (15/22) Target started (15/22, AT2025fma)
02:20:07       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
02:22:41       Focusing Completed Foc1 AutoFocus Completed (Profile No 11)
02:38:45     Target Completed Target completed (15/22, AT2025fma)
02:38:49     Target Started (16/22) Target started (16/22, UGC 11097 w/AT2024ajp)
02:42:27       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
02:45:05       Focusing Completed Foc1 AutoFocus Completed (Profile No 12)
03:01:09     Target Completed Target completed (16/22, UGC 11097 w/AT2024ajp)
03:01:13     Target Started (17/22) Target started (17/22, AT2023coi)
03:05:33       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
03:07:47       Focusing Completed Foc1 AutoFocus Completed (Profile No 13)
03:24:40     Target Completed Target completed (17/22, AT2023coi)
03:24:44     Target Started (18/22) Target started (18/22, GCVS CY Lyr)
03:31:35     Target Completed Target completed (18/22, GCVS CY Lyr)
03:31:39     Target Started (19/22) Target started (19/22, GCVS CI Cyg)
03:32:54       SoftSuspend Called Soft Suspend called due to Deteriorating Conditions (too few stars)
03:34:57       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
03:37:30       Focusing Completed Foc1 AutoFocus Completed (Profile No 14)
03:42:05     Target Completed Target completed (19/22, GCVS CI Cyg)
03:42:08   Queue Paused Queue paused for Session Suspension
03:42:11 Session Suspending Session suspending
03:43:00   Dome Closed Dome closed (Closing time 50s, Zigbee 43s)
03:43:03 Session Suspended Session suspended
03:50:12     Target Cancelled Target cancelled (20/22, GCVS BL Lac) due to too few stars
04:10:32     Target Cancelled Target cancelled (21/22, UGC 12293 w/AT2025gyi) due to cloud
04:45:52     Target Cancelled Target cancelled (22/22, C/2025 F2 (SWAN)) due to cloud
04:45:56   Queue Completed Job Queue completed
04:46:01 Session Closing Session closing
04:46:06   Dome Closed Dome already closed (closed at 03:43, closing time 50s, zigbee 43s)
04:46:24   Dome Parked Dome parked (parking time 10s), Az: 90.0 deg
04:47:07   Telescope Parked Telescope parked (parking time 39s total)
04:47:31   Telescope State Handbox reads 'Scope parked Turn scope off.'
04:47:53   Telescope Switched Off Telescope Power has been switched off via UPB Switch.
04:49:18   Services Stopped Night Services stopped
04:49:21 Session Finishing Session Finishing started (Create Fits Summary, Transfer Files)
04:49:43     Dome (Find Park) Find Park started (Search Az 88.0 to 92.0°, Step 0.2°, Narrow)
04:50:28     Dome Find Park found (Best Park Az 90.4°)
04:50:34     Dome Dome has been synced at park position (Az 90.0°, Adjustment: -0.4°)
04:50:36   Dome Parked Dome parked
04:52:47   Dome Charging Dome is parked and re-charging Ok (17mA)
04:52:49 Session Finished Session Finished
 
Session Alerts & Alarms
Time     Type       Name Detail
04:52:47 Green Clear Dome Charging Dome is parked and re-charging Ok (17mA)
 

Back to Top


Operational Issues (2025-04-10, S1314)

[ Prev | Next ]

Critical Issues

Major Issues

Minor Issues

Small Defects

Continuous Improvement

[ Prev | Next ]

Back to Top


Geomagnetic Station - Final Assembly (2025-04-09 to 2025-04-11)

A Geomagnetic Monitoring Station is being added to the Observatory in Spring 2025 for monitoring changes in the earth's magnetic field and to supplement and build upon the Observatory's existing Aurora monitoring that use a Black/White AllSky Camera and new NorthCam Colour Camera.

The following notes describe the Final Assembly Phase

Other notes :
 | Review | SAM III | Site Prep | Assembly Design | Parts Assembly | Testing | Final Assembly | Installation | Commissioning |

Assembly Attempt (2025-04-09)

Based on the Sensor2's higher sensitivity to temperature changes (Y in above burn-in & monitoring tests) it has been decided to use it as the Z Axis Sensor.  This means it will lie deepest of the 3 sensors and can be expected to experience the least temperature fluctuations.

As a consequence Sensor3 (Z in above burn-in & monitoring test) will be used as the Y Axis Sensor

Sensor1 will continue as the Z Axis Sensor

The sensor cables have been re-coded with coloured electrical tape at both ends for identification

X Axis (Sensor1 / CableA)   - Blue
Y Axis (Sensor3 / CableC)  - Red
Z Axis (Sensor2 / CableB)  - Green

Began assembly but ran into problems with

May need to buy some new pipework for housing the Y axis Sensor (End Stop, Straight Junction and Connector & Side-Elbow Junction)

Assembly Correction (2025-04-10)

New End Piece, Straight Junction and Side-Elbow Junction bought from Hardware Shop in order to replace the housing that had to be sacrificed to get the FG-3+ sensor out in order to reconnect it again.  

New housing successfuly built.

Assembly commenced with building/assembly of Y and Z axis housings.

Final Assembly (2025-04-11)

Assembly of magnetometer sensor fixture completed including Temperature Sensor Probe. 
Cable inlet sealed with two plugs of Epoxy Fller

Assembly of X and Y Axis
Solvent Glue used to connect part of pipe together
Hot Glue used to hold cable internally in place
    Assembly of Z and Y Axis together
After this the Temperature Sensor Probe was installed
internally at position indicated
Image   Image
      
Assembly of X, Y Axis & Cable Inlet
X Axis and Y Axis units assembled with an angular offset
of 90 deg, taking care that in final position the FG-3+ pins
will be in South direction (X Axis) &
West direction (Y Axis) respecively
    X, Y Axis & Cable Inlet (Detail)
X & Y axis are positioned 90 deg apart
Image   Image
      
Use of Epoxy Filler to seal the Cable Inlet
(stage 1)
    Cable Inlet (detail)
Showing first plug of epoxy filler
Image   Image
     
Use of Epoxy Filler to seal the cable inlet
(stage 2)
    Cable Inlet (final)
Showing second plug of epoxy filler
with 3 magnetometer sensor cables (Cat6)
and 1 temperature sensor cable emerging
Image   Image
     
Completed Assembly      
Image    
     
Final Fixture Tests
Confirming that connections to the 3
magnetometer sensors are still working
    Final Fixture Tests - Relief !!
SAM III Unit is still seeing all 3 sensors
Image   Image
     
Sensor Fixture completed and moved outside
Cables emerging from the pipework fixture are
Blue:  X Axis Cable (cat6), Red: Y Axis Cable (cat6)
Green:  Z Axis Cable (cat6), Yellow:  Temperature
    Sensor Fixture - Alternate View
Image   Image
     

 | Review | SAM III | Site Prep | Assembly Design | Parts Assembly | Testing | Final Assembly | Installation | Commissioning |

Back to Top