David's Astronomy Pages
Notes - Session 1400 (2026-03-04)

 
Bullet Session Aims & Highlights
 - Observing Result
 - Night Summary Plot
 - Session Event Log
Bullet Operational Issues
- Critical Issues (0),  Major Issues (1),  Minor Issues (4),  Small Defects (1),  Continuous Improvement (3)
- Figures (0)
   
Bullet Images from 2026-03-04  >>           
   
Bullet Current/Latest Session >>
   

Session Aims & Highlights (2026-03-04)

Main aims

  1. Targets.  Acquire images of a selection of variable stars, nearby stars, comets & deep sky targets as allowed by sky conditions.

 Equipment & Software

Highlights

Notes

Summary Plots & Logs

Observing Plan
Image
  
Observing Result
Image
   
Image
 
Dome & Scope Slewing Performance
Image
  
Slew/Centering Performance
Image
  
Guiding Performance
Image
  
Sky Conditions (Locate Frames)
Image 
  
Night Sky Summary Plot
Top axis: Sky Brightness at Zenith (in ADU/s)
Lefthand axis: Local Time (hh LT). Righthand axis: Sun Altitude (degs)
Note:  The NorthCam Star Count line is unreliable and should be ignored
(The AstroNorthCam 'Find' Star method is producing many false positives from clouds)
Image   
  
Actual Weather vs Pre-Session Weather Forecast
Image
Image
 
Session Event Log
Time     Event Detail
19:37:55 Session Monitoring AutoStart monitoring for Live Session opportunity between 19:37 & 05:05
19:37:57 Session AutoStarting Session autostarting (19:37)
19:38:03 Session Created Session Created (Live, 2026-03-04 S01400)
19:38:06   CCDSoft Restarting CCDSoft being restarted (to set AutoSave No.)
19:38:25   Scope Switched On Telescope Power has been switched on via UPB Switch
19:40:13   Services Started Observatory Services started
19:40:23 Observatory (Auto) Observatory placed in Fully-Automated Mode
19:40:27 Session Pending Session pending (2026-03-04)
19:40:29 Session Initiating Session initiating (2026-03-04)
19:40:52   Camera1 Connected SBIG Camera connected (Set point -20°C)
19:40:54   Plan Requested Observing Plan requested from AstroPlan (1.46.2)
19:42:30   Plan Loaded Observing Plan loaded to queue (PlanID: 1196)
19:43:12   Telescope Connected Telescope connected (TheSky6)
19:43:36 Session Equilibration Session ready to Open Dome
19:44:22   Dome Opened Dome opened (Opening time 45s, Zigbee 41s)
19:44:24 Session Running Session running
19:44:26   Queue Started Observing Queue started (5 targets selected)
19:44:32     Target Started (NrZen) Target started (Focus Field 5, HIP 23569)
19:44:41       Dome Unparked Dome unparked
19:48:59       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
19:51:23       Focusing Completed Foc1 AutoFocus Completed (Profile No 1, wide)
19:53:25       Focusing Completed Foc1 AutoFocus Completed (Profile No 1)
19:53:28       Focusing Started-Foc2 Foc2 Focusing Started (Secondary Scope, using ShCap)
19:55:29       Focusing Completed Foc2 AutoFocus Completed (Profile No 2, wide)
19:57:17       Focusing Completed Foc2 AutoFocus Completed (Profile No 2)
19:57:38     Target Completed (NrZen) Target completed (Focus Field 5, HIP 23569)
19:57:41 User Intervention User Intervention to abort job queue & switch back to Manual Mode
19:57:44     Target Started (1/5) Target started (1/5, UGC 117 w/SN2026cbh)
19:57:46     Target Failed (1/5) Target failed due to aborted (1/5, UGC 117 w/SN2026cbh)
19:57:49   Queue Aborted Job Queue aborted
19:57:51 Observatory (Manual) Observatory placed in Manual Mode
19:58:17 Session Monitoring AutoStart monitoring for Live Session opportunity between 19:58 & 05:05
19:58:19 Observatory (AutoStart) Observatory placed in Auto-Start Mode
19:58:21 Session AutoStarting Session autostarting (19:58)
19:58:24 Session Resumed Session Resumed (Live, 2026-03-04 S01400)
19:58:33   Services Started Observatory Services started
19:58:40 Observatory (Auto) Observatory placed in Fully-Automated Mode
19:58:43 Session Pending Session pending (2026-03-04)
19:58:45 Session Initiating Session initiating (2026-03-04)
19:58:58   Camera1 Connected SBIG Camera connected (Set point -20°C)
19:59:05   Plan Requested Observing Plan requested from AstroPlan (1.46.2)
20:00:42   Plan Loaded Observing Plan loaded to queue (PlanID: 1197)
20:00:52   Telescope Connected Telescope connected (TheSky6)
20:01:16 Session Running Session running
20:01:19   Queue Started Observing Queue started (5 targets selected)
20:01:29     Target Started (1/5) Target started (1/5, UGC 117 w/SN2026cbh)
20:05:27       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
20:07:40       Focusing Completed Foc1 AutoFocus Completed (Profile No 5)
20:23:57     Target Completed Target completed (1/5, UGC 117 w/SN2026cbh)
20:24:01     Target Started (2/6) Target started (2/6, NGC 2129, ToO)
20:28:11       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
20:30:18       Focusing Completed Foc1 AutoFocus Completed (Profile No 6)
20:33:51     Target Completed Target completed (2/6, NGC 2129, ToO)
20:33:55     Target Started (3/7) Target started (3/7, NGC 2388, ToO)
20:37:37       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
20:40:39       Focusing Completed Foc1 AutoFocus Completed (Profile No 7)
20:56:44     Target Completed Target completed (3/7, NGC 2388, ToO)
20:56:48     Target Started (4/8) Target started (4/8, ARP 250, ToO)
21:00:21       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
21:02:43       Focusing Completed Foc1 AutoFocus Completed (Profile No 8)
21:11:15     Target Completed Target completed (4/8, ARP 250, ToO)
21:11:19     Target Started (5/9) Target started (5/9, UGC 622 w/AT2026epv, ToO)
21:16:30       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
21:18:45       Focusing Completed Foc1 AutoFocus Completed (Profile No 9)
21:35:04     Target Completed Target completed (5/9, UGC 622 w/AT2026epv, ToO)
21:35:09     Target Started (6/10) Target started (6/10, Jupiter, ToO)
21:46:34     Target Completed Target completed (6/10, Jupiter, ToO)
21:46:39     Target Started (7/11) Target started (7/11, GCVS GK Per, ToO)
21:50:14       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
21:52:36       Focusing Completed Foc1 AutoFocus Completed (Profile No 10)
21:55:32     Target Completed Target completed (7/11, GCVS GK Per, ToO)
21:55:37     Target Started (8/12) Target started (8/12, GCVS NV Ori, ToO)
21:55:42     Target Failed (8/12) Target failed due to airmass limit (8/12, GCVS NV Ori, ToO)
21:55:46     Target Started (9/13) Target started (9/13, UGC 3028 w/SN2026gm, ToO)
21:59:53       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
22:02:11       Focusing Completed Foc1 AutoFocus Completed (Profile No 11)
22:18:29     Target Completed Target completed (9/13, UGC 3028 w/SN2026gm, ToO)
22:18:33     Target Started (10/14) Target started (10/14, NGC 1664, ToO)
22:21:49       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
22:24:28       Focusing Completed Foc1 AutoFocus Completed (Profile No 12)
22:29:16     Target Completed Target completed (10/14, NGC 1664, ToO)
22:29:20     Target Started (11/15) Target started (11/15, GCVS RZ LMi, ToO)
22:34:16       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
22:36:44       Focusing Completed Foc1 AutoFocus Completed (Profile No 13)
22:42:00     Target Completed Target completed (11/15, GCVS RZ LMi, ToO)
22:42:02     Target Missed (12/15) Target's time slot was missed (12/15, GCVS TV Cas)
22:42:04     Target Missed (13/15) Target's time slot was missed (13/15, UGC 622 w/AT2026epv)
22:42:06     Target Missed (14/15) Target's time slot was missed (14/15, GCVS U And)
22:42:08     Target Missed (15/15) Target's time slot was missed (15/15, 240P/NEAT)
22:42:10   Queue Completed Job Queue completed
22:43:35     Target Started (1/1) Target started (1/1, NGC 6166). Using SharpCap
22:47:12       Focusing Skipped Foc1 focusing skipped - star is too dim (TCF-LSI)
22:49:21     Target Failed (1/1) Target failed (1/1, NGC 6166) due to aborted
22:50:22     Target Started (1/1) Target started (1/1, NGC 6166)
22:51:42       Camera1 Connected SBIG Camera connected (Set point -20°C)
22:54:39       Focusing Skipped Foc1 focusing skipped - star is too dim (TCF-LSI)
23:59:48   Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Dome)
00:00:33   Dome Closed Dome closed (Closing time 46s, Zigbee 43s)
00:01:07     Target Completed Target partially completed (1/1, NGC 6166)
00:14:57   Dome Parked Dome parked (parking time 13s), Az: 90.0 deg
00:15:46   Telescope Parked Telescope parked (parking time 46s total)
00:16:10   Telescope State Handbox reads 'Scope parked Turn scope off.'
00:17:01   Telescope Switched Off Telescope Power has been switched off via UPB Switch.
00:17:41     Camera1 Disconnected SBIG Camera closed down & disconnected
00:19:11   Services Stopped Night Services stopped
00:27:41   Services Stopped Observatory Services stopped
00:28:29 Session Resumed Session Resumed (Live, 2026-03-04 S01400)
00:28:35 Program Opened Program Opened (AstroMain 3.80.20)
00:28:37   CCDSoft Restarting CCDSoft being restarted (to set AutoSave No.)
00:28:53   Obs.Overseer Started Obs.Overseer started
00:29:31   Obs.Manager Started Obs.Manager started
00:29:33   Services Started Observatory Services started
00:33:01   Services Stopped Observatory Services stopped
00:33:46 Session Resumed Session Resumed (Live, 2026-03-04 S01400)
00:33:53 Program Opened Program Opened (AstroMain 3.80.20)
00:33:57   Obs.Overseer Started Obs.Overseer started
00:34:31   Obs.Manager Started Obs.Manager started
00:34:33   Services Started Observatory Services started
 
Session Alerts & Alarms
Time     Type       Name Detail
--             No Alerts                --                              
 

Back to Top


Operational Issues (2026-03-04 S1400)

[ Prev | Next ]

Critical Issues

Major Issues

Minor Issues

Small Defects

Continuous Improvement

[ Prev | Next ]

Back to Top Issue,  Back to Top


Fig 1

[ Prev | Next ]

Back to Top Issue,  Back to Top