David's Astronomy Pages
Notes - Session 1447 (2026-09-04)

 
Bullet Session Aims & Highlights
 - Observing Result
 - Night Summary Plot
 - Session Event Log
Bullet Operational Issues
- Critical Issues (0),  Major Issues (0),  Minor Issues (0),  Small Defects (5),  Continuous Improvement (3)
- Figures (0)
   
Bullet Images from 2026-09-04  >>           
   
   

Session Aims & Highlights (2026-09-04)

Main aims

  1. Targets.  Acquire images of a selection of variable stars, nearby stars, comets & deep sky targets as allowed by sky conditions.
  2. AstroMain. Check new AstroMain xx.xx  version for any issues or problems following introduction of a number of changes.

 Equipment & Software

Highlights

Notes

Summary Plots & Logs

Observing Plan
Image
  
Observing Result
Image
   
Image
 
Dome & Scope Slewing Performance
Image
  
Slew/Centering Performance
Image
  
Guiding Performance
Image
  
Sky Conditions (Locate Frames)
Image
  
Night Sky Summary Plot
Top axis: Sky Brightness at Zenith (in ADU/s)
Lefthand axis: Local Time (hh LT). Righthand axis: Sun Altitude (degs)
Note:  The NorthCam Star Count line is unreliable and should be ignored
(The AstroNorthCam 'Find' Star method is producing many false positives from clouds)
Image   
  
Actual Weather vs Pre-Session Weather Forecast
Image
Image
 
Session Event Log
Time     Event Detail
21:37:50 Session Monitoring AutoStart monitoring for Live Session opportunity between 21:37 & 04:44
21:37:51 Session AutoStarting Session autostarting (21:37)
21:37:57 Session Created Session Created (Live, 2026-09-04 S01447)
21:37:59   CCDSoft Restarting CCDSoft being restarted (to set AutoSave No.)
21:38:21   Scope Switched On Telescope Power has been switched on via UPB Switch
21:40:08   Services Started Observatory Services started
21:40:18 Observatory (Auto) Observatory placed in Fully-Automated Mode
21:40:21 Session Pending Session pending (2026-09-04)
21:40:23 Session Initiating Session initiating (2026-09-04)
21:40:45   Camera1 Connected SBIG Camera connected (Set point -10°C)
21:40:48   Plan Requested Observing Plan requested from AstroPlan (1.47.1)
21:41:56   Plan Loaded Observing Plan loaded to queue (PlanID: 1248)
21:42:35   Telescope Connected Telescope connected (TheSky6)
21:43:00 Session Equilibration Session ready to Open Dome
21:43:46   Dome Opened Dome opened (Opening time 45s, Zigbee 40s)
21:43:51 Session Running Session running
21:43:54   Queue Started Observing Queue started (18 targets selected)
21:44:00     Target Started (NrZen) Target started (Focus Field 21, HIP 103850)
21:44:15       Dome Unparked Dome unparked
21:47:42       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
21:49:52       Focusing Completed Foc1 AutoFocus Completed (Profile No 1, wide)
21:52:00       Focusing Completed Foc1 AutoFocus Completed (Profile No 1)
21:52:08       Focusing Started-Foc2 Foc2 Focusing Started (Secondary Scope, using ShCap)
21:54:04       Focusing Completed Foc2 AutoFocus Completed (Profile No 2, wide)
21:55:49       Focusing Completed Foc2 AutoFocus Completed (Profile No 2)
21:56:11     Target Completed (NrZen) Target completed (Focus Field 21, HIP 103850)
21:57:16     Target Started (1/18) Target started (1/18, Nova Aql 2026 (Nova))
22:02:13       Focusing Skipped Foc1 focusing skipped - star is lost (TCF-LSI)
22:17:11     Target Completed Target completed (1/18, Nova Aql 2026 (Nova))
22:17:53     Target Started (2/18) Target started (2/18, GCVS BL Lac)
22:22:10       Focusing Skipped Foc1 focusing skipped - unable to find a star (TCF-LSI)
22:22:37   Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Dome)
22:22:39   HardSuspend Called Hard Suspend called due to Critical Conditions (cloud)
22:22:42     Target Aborted (2/18) Target aborted (2/18, GCVS BL Lac) due to cloud
22:22:44   Queue Paused Queue paused for Session Suspension
22:22:46 Session Suspending Session suspending
22:23:33   Dome Closed Dome closed (Closing time 50s, Zigbee 43s)
22:23:38 Session Suspended Session suspended
22:27:07     Target Cancelled Target cancelled (2/18, GCVS BL Lac) due to cloud
22:47:27     Target Cancelled Target cancelled (3/18, NGC 7331 w/SN2026aaiv) due to cloud
23:09:47     Target Cancelled Target cancelled (4/18, UGC 242 w/SN2026yum) due to cloud
00:10:07     Target Cancelled Target cancelled (5/18, NGC 7293) due to cloud
00:18:04 Session Resuming Session resuming
00:18:49   Dome Opened Dome opened (Opening time 45s, Zigbee 40s)
00:18:54 Session Running Session running
00:18:56   Queue Resumed Observing Queue resumed
00:18:58     Target Started (6/18) Target started (6/18, UGC 12613)
00:29:30   Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Dome)
00:29:32   HardSuspend Called Hard Suspend called due to Critical Conditions (cloud)
00:29:37     Target Aborted (6/18) Target aborted (6/18, UGC 12613) due to cloud
00:29:39   Queue Paused Queue paused for Session Suspension
00:29:41 Session Suspending Session suspending
00:30:31   Dome Closed Dome closed (Closing time 50s, Zigbee 43s)
00:30:36 Session Suspended Session suspended
00:31:27     Target Cancelled Target cancelled (6/18, UGC 12613) due to cloud
00:37:57 Session Resuming Session resuming
00:38:42   Dome Opened Dome opened (Opening time 45s, Zigbee 40s)
00:38:44 Session Running Session running
00:38:46   Queue Resumed Observing Queue resumed
00:38:49     Target Started (7/18) Target started (7/18, M31 w/AT2026aaom)
00:56:33   Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Dome)
00:56:35   HardSuspend Called Hard Suspend called due to Critical Conditions (cloud)
00:56:37     Target Aborted (7/18) Target aborted (7/18, M31 w/AT2026aaom) due to cloud
00:56:39   Queue Paused Queue paused for Session Suspension
00:56:41 Session Suspending Session suspending
00:57:24   Dome Closed Dome closed (Closing time 45s, Zigbee 43s)
00:57:29 Session Suspended Session suspended
00:59:49 Session Resuming Session resuming
01:00:35   Dome Opened Dome opened (Opening time 45s, Zigbee 40s)
01:00:37 Session Running Session running
01:00:39   Queue Resumed Observing Queue resumed
01:00:41     Target Started (8/18) Target started (8/18, UGC 12856)
01:04:50   Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Dome)
01:04:52   HardSuspend Called Hard Suspend called due to Critical Conditions (cloud)
01:04:54     Target Aborted (8/18) Target aborted (8/18, UGC 12856) due to cloud
01:04:56   Queue Paused Queue paused for Session Suspension
01:04:58 Session Suspending Session suspending
01:05:45   Dome Closed Dome closed (Closing time 50s, Zigbee 43s)
01:05:50 Session Suspended Session suspended
01:16:07     Target Cancelled Target cancelled (8/18, UGC 12856) due to cloud
01:38:27     Target Cancelled Target cancelled (9/18, UGC 279 w/SN2026zyf) due to cloud
02:00:27     Target Cancelled Target cancelled (10/18, M31 w/AT2026aabo) due to cloud
02:12:37     Target Cancelled Target cancelled (11/18, GCVS RX And) due to wind
02:38:19     Target Cancelled Target cancelled (12/18, NGC 7741) due to cloud
03:00:39     Target Cancelled Target cancelled (13/18, SHK 38) due to cloud
03:22:59     Target Cancelled Target cancelled (14/18, NGC 470) due to cloud
03:33:04 Session Resuming Session resuming
03:33:49   Dome Opened Dome opened (Opening time 45s, Zigbee 40s)
03:33:54 Session Running Session running
03:33:56   Queue Resumed Observing Queue resumed
03:33:58     Target Started (15/18) Target started (15/18, NGC 1247 w/SN2026xqu)
03:40:55   Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Dome)
03:40:57   HardSuspend Called Hard Suspend called due to Critical Conditions (cloud)
03:40:59     Target Aborted (15/18) Target aborted (15/18, NGC 1247 w/SN2026xqu) due to cloud
03:41:01   Queue Paused Queue paused for Session Suspension
03:41:03 Session Suspending Session suspending
03:41:50   Dome Closed Dome closed (Closing time 50s, Zigbee 43s)
03:41:56 Session Suspended Session suspended
03:43:56 Session Resuming Session resuming
03:44:41   Dome Opened Dome opened (Opening time 45s, Zigbee 40s)
03:44:46 Session Running Session running
03:44:49   Queue Resumed Observing Queue resumed
03:44:51     Target Started (15/18) Target started (15/18, NGC 1247 w/SN2026xqu)
03:52:58     Target Completed Target partially completed (15/18, NGC 1247 w/SN2026xqu)
03:53:02     Target Started (16/18) Target started (16/18, Gliese 65)
03:59:13   Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Dome)
03:59:15   HardSuspend Called Hard Suspend called due to Critical Conditions (cloud)
03:59:19     Target Aborted (16/18) Target aborted (16/18, Gliese 65) due to cloud
03:59:21   Queue Paused Queue paused for Session Suspension
03:59:24 Session Suspending Session suspending
04:00:14   Dome Closed Dome closed (Closing time 49s, Zigbee 43s)
04:00:19 Session Suspended Session suspended
04:02:19 Session Resuming Session resuming
04:03:04   Dome Opened Dome opened (Opening time 45s, Zigbee 40s)
04:03:09 Session Running Session running
04:03:11   Queue Resumed Observing Queue resumed
04:03:14     Target Started (17/18) Target started (17/18, GSC 1224:29)
04:06:30   Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Dome)
04:06:32   HardSuspend Called Hard Suspend called due to Critical Conditions (cloud)
04:06:34     Target Aborted (17/18) Target aborted (17/18, GSC 1224:29) due to cloud
04:06:36   Queue Paused Queue paused for Session Suspension
04:06:38 Session Suspending Session suspending
04:07:25   Dome Closed Dome closed (Closing time 50s, Zigbee 43s)
04:07:31 Session Suspended Session suspended
04:09:31 Session Resuming Session resuming
04:10:16   Dome Opened Dome opened (Opening time 45s, Zigbee 40s)
04:10:21 Session Running Session running
04:10:23   Queue Resumed Observing Queue resumed
04:10:25     Target Started (17/18) Target started (17/18, GSC 1224:29)
04:18:48     Target Completed Target partially completed (17/18, GSC 1224:29)
04:18:52     Target Started (18/18) Target started (18/18, NGC 3310 w/SN2026sqf)
04:19:02   Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Dome)
04:19:04   HardSuspend Called Hard Suspend called due to Critical Conditions (cloud)
04:20:12     Target Failed (18/18) Target failed due to aborted (18/18, NGC 3310 w/SN2026sqf)
04:20:14   Queue Paused Queue paused for Session Suspension
04:20:16 Session Suspending Session suspending
04:21:04   Dome Closed Dome closed (Closing time 50s, Zigbee 43s)
04:21:09 Session Suspended Session suspended
04:34:50 Session Resuming Session resuming
04:35:36   Dome Opened Dome opened (Opening time 45s, Zigbee 40s)
04:35:41 Session Running Session running
04:35:43   Queue Resumed Observing Queue resumed
04:35:45     Target Started (18/18) Target started (18/18, NGC 3310 w/SN2026sqf)
04:48:17     Target Completed Target partially completed (18/18, NGC 3310 w/SN2026sqf)
04:48:20   Queue Completed Job Queue completed
04:48:22 Session Closing Session closing
04:49:12   Dome Closed Dome closed (Closing time 49s, Zigbee 43s)
04:49:52   Dome Parked Dome parked (parking time 27s), Az: 90.0 deg
04:50:51   Telescope Parked Telescope parked (parking time 52s total)
04:51:15   Telescope State Handbox reads 'Scope parked Turn scope off.'
04:52:11   Telescope Switched Off Telescope Power has been switched off via UPB Switch.
04:53:35   Services Stopped Night Services stopped
04:53:38 Session Finishing Session Finishing started (Create Fits Summary, Transfer Files)
04:54:00     Dome (Find Park) Find Park started (Search Az 88.0 to 92.0°, Step 0.2°, Narrow)
04:54:44     Dome Find Park found (Best Park Az 90.2°)
04:54:50     Dome Dome has been synced at park position (Az 90.0°, Adjustment: -0.2°)
04:54:52   Dome Parked Dome parked
04:57:53   Dome Charging Dome hasn't started re-charging after 3.1 minutes
04:57:55 Session Finished Session Finished
 
Session Alerts & Alarms
Time     Type       Name Detail
04:10:32 Yellow Alert Dome Discrepency Difference between Dome Az and Slave Az is > 1 deg (GSC 1224:29)
04:57:53 Red Alert Dome Charging Dome hasn't started re-charging after 3.1 minutes
 

Back to Top


Operational Issues (2026-09-04 S1447)

[ Prev | Next ]

Critical Issues

Major Issues

Minor Issues

Small Defects

Continuous Improvement

[ Prev | Next ]

Back to Top Issue,  Back to Top


Fig 1.

[ Prev | Next ]

Back to Top Issue,  Back to Top